EasyManua.ls Logo

Fluke 93 - Standard Performance

Fluke 93
267 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-2
PERFORMANCE VERIFICATION
PROCEDURE
The Additional
Performance Verification Procedure
can be used to do some extra
checks,
depending
on the Scope Meter version
(93, 95
or
97).
In
these tests the ScopeMeter must
be set up
manually.
NOTE:
This Performance Verification Procedure
is a quick way to check most
of
the
instrument's
specifications. Because of the highly integrated design
of the ScopeMeter. it is not always
necessary to check ail features
separately. The procedure described here
often combines
many test steps in one procedure
step, thereby minimizing totaJ test time.
The
Performance
Verif/cation Procedure
is based on the specifications, listed in chapter
2
of
this Service
Manual. The values (requirements) given
here are valid for ambient
temperatures
between idCandZBC.
4.2
STANDARD PERFORMANCE
VERIFICATION PROCEDURE
This section explains the required
Performance Verification Procedure
setup, with the actions that
have to be done for each step. Follow
the
instructions
described with each
step.
The
recommended test equipment, required
for this Standard Performance Verification
Procedure, is
listed
In table 4.1.
Table 4. 1 Recommended test
equipment Standard Performance Verification Procedure
Instrument
Type Recommended Model
Multifunction
Calibrator
Fluke 5100B
Function Generator
Philips PM 5134
Time
Mark Generator Tektronix
TG
501
Constant Amplitude
Sine
wave Generator
Tektronix
SG 503
Square wave
Calibration Generator
Tektronix PQ 506
Cables and terminations for
the generators (all BNCtype)
Two standard banana test leads (delivered
with the ScopeMeter)
BNC (fern ale )-to-banar\a
(male) (delivered with the ScopeMeter)
NOTE: During
the following Performance Verification Procedure,
the ScopeMeter ir\put sockets are
connected
to
the
signal generator outputs by
means of cables (BNC connector channei A or
B) or two
standard banana test leads (COM
and mV/Ohm/Dlode banana connectors). The
oscilloscope probes delivered with
the instrument are not
used
during
the Standard
Performance Verihcaticn
Procedure. The calibration of the probes
is
described
in the Users
Manual.
In the following text,
this figure Is used to indicate that one
of the
selecVadjust
keys
(up/down) must be pressed, to display the Indicated
step number “x" on the
ScopeMeter screen.

Table of Contents

Related product manuals