EasyManua.ls Logo

Fluke 93 - Page 75

Fluke 93
267 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
PERFORMANJCE
VERIFICATION PROCEDURE
Tost setup channel
6 rise Hme measurement:
Proce<iiire
for channel B rise time
measurement:
A
Apply
a fast rise time pulse,
repetition frequency 1 MHz, amplitude
0.5V to channel B.
Use a 50Q
termination.
SetUie generator In
position “FAST RISE*.
B Adjust the pulse
am^^ltude to exactly
5 divisions. See figure 4.4.
Requirements:
A/OTE;
i^( measured)
= Inputsigriaf)
^
+ t^{
ScopeMeter)
®
)
C Check the
rise time, measured between
10% and 90% of the pulse
amplitude. See figure 4.4.
The rise time
t^ {measured) must
be 7
ns
(0.7 div) or less.
Figure 4.4
Rise time <o,7div
blbVm
Test setup
channel A rise time measurement:
Refer
to the test set-up for channel B
measurement. Connect the pulse
generator
to the channel A BNC Input connector.

Table of Contents

Related product manuals