PERFORMANCE VERIFICATION PROCEDURE 4-
11
Test set-up:
Procedure:
A Apply
a
2 kHz sine
wave signal of 800 mV peak-to-peaK to channel A and channel B.
Use 50^
terminations.
Adjust the Input signal to
a trace height of 8 divisions.
Requirements:
Verify that
a
line with
an angle of
45°
is displayed.
See
figure 4.8.
Figure 4.8
A versus 8
display
21/22. Base line instability
This test checks the maximum
base line
instability.
Teat equipment:
none
Test setup:
no special
setup
required