PERFORMANCE VERIFICATION PROCEDURE
4-
17
4.4 ADDITIONAL PERFORMANCE VERIFICATION PROCEDURE
This paragraph describes the Additional Performance Vehficaton Procedure.
This procedure
can
be used to
do
some extra performance tests, depending on
the
ScopeMeter
version
(93, 95,
or 97).
Follow
the instmctions described with each step.
The
recommended test
equipment
required for this Additional
Performance
Verihcation Procedure is
listed
In table 4.4.
Table 4.4 Recommended test equipment for Additional Performance Verification Procedure.
instrument
Type
Recommended Model
Function Generator Philips PM 51 34
Multimeter Philips PM
2525
Power
Supply Philips PE 1537
Time Mark Generator Tektronix TG 501
Constant Amplitude
Sine wave Generator
Tektronix
SG 503
Square wave
Calibration Generator
Tektronix PG 506
Cables and
terminators for the generators (all BNC
type)
Two standard banana test leads (delivered with the ScopeMeter)
'
BNC (fern ale) -to-banana (male) (delivered with the ScopeMeter)
5 mm. Power Jack connector plug with attached cable (e.g.; 4822 321 20125)
NOTE: During the following Performance Verificetion Procedure,
you must
connect the ScopeMeter
ir^put connectors to the signal generator outputs. This connection must be made by cables
(BNC connector ctjannei A or B) or two standard banana test leads (COM and
mV/Ohm/Diode banana connectors^ The Additional Performance Verification Procedure
does not use the oscilloscope probes delivered with the Instrument. The calibratior} of the
probes is described in the Operating Manual.
1. Autoset
All
models
•••
This test checks the correct operation of the AUTO SET function.
Test equipment:
Tektronix SQ 503 Constant Amplitude Sine wave Generator