Installation Preparations
Materials
1
3
4
2
No. Item
1 aPower 1 Set
2 Quick release grating 1 Set
3 Mounting bracket 1PCS
4 M5x25 screw 2PCS
aPower and all accessories
1
No. Item
1 aGate 1 Set
2 1/4” water-tight washer 4 PCS
3 Connection labels 1 Set
4 Main switch mounting screw
M4×10
2 PCS
2 4
3
aGate and accessories
1
2
3
4
Materials to be prepared by installers
No. Item
1 Electric conduit, Hub, pull box and their
fittings
2
Copper cables, see P26 for specifications.
3 Antioxidant conductive paste
4
Screws and washers for wall installation.
See P22-P23.
5 See the switch and fittings section for
models of switches.
6 Optional: Customer external CT
7 aPower combiner box (for parallel
on the number of aPower available)
8 Reducing Washer Conduit Fittings
9 Sealant (for use on outdoor conduits)
10 5/8 in Type X plasterboard
11 Network cable and registered jacks
5
6
8
7
9
9
10
11
14