EasyManua.ls Logo

Fronius CMT Twin - Notes Regarding the Installation of Fronius System Components; Installation and Commissioning of Fronius System Components; Setup Regulations for the Power Sources

Fronius CMT Twin
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Notes regarding the installation of Fronius system
components
Installation and
commissioning of
Fronius system
components
Setup regulations
for the power
sources
NOTE! Install and commission Fronius system components (power source, wire-
feed unit, cooling unit, hosepack, RCU 5000i, LHSB-HUB, etc.) according to the
operating instructions of the relevant device.
NOTE! If the power sources are used with two FK 4000 R, ensure a minimum gap
of 1000 mm (39.07 in.) between the power sources in order to guarantee a suffi-
cient supply of fresh air to the cooling units.
NOTE! If the power sources are used with two FK 9000 R, ensure a minimum gap
of 1000 mm (39.07 in.) between the power sources in order to guarantee a suffi-
cient supply of fresh air to the cooling units.
1000 mm
(39.37 in.)

Table of Contents

Related product manuals