EasyManua.ls Logo

Fronius CMT Twin - Start Delay Parameter Correction

Fronius CMT Twin
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
37
EN
- which wire electrode is the lead elec-
trode (wire electrode 1)
- which wire electrode is the trail electro-
de (wire electrode 2)
Start delay pa-
rameter correc-
tion
The "Start delay" parameter is corrected to
delay welding from the trail electrode until
the lead electrode has melted the material.
The trail electrode therefore welds in the
weld pool and not on the solid material, de-
livering an optimum start to the weld seam.
Setting range: 0 - 5 (0 - 2.5 seconds)
NOTE! If both wire electrodes are to weld with the CMT process, then the follow-
ing must be selected for each wire electrode in the "Filler metal/Select a shielding
gas" menu on the RCU 5000i:

Table of Contents

Related product manuals