Testing backup
power mode
After the initial installation and configuration of the backup power operation, it is
recommended to test the backup power operation. For test mode, a battery
charge of min. 30 % is recommended.
A description on how to run test mode can be found in the backup power check-
list (https://www.fronius.com/en/search-page, item number: 42,0426,0365).
170

Table of Contents

Other manuals for Fronius Primo GEN24 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fronius Primo GEN24 Series and is the answer not in the manual?

Fronius Primo GEN24 Series Specifications

General IconGeneral
TypeHybrid Inverter
THD< 3 %
Number of MPP trackers2
Max. efficiency98.1 %
Protection classIP66
DC isolationYes
AC Output Power3.0 kW to 10.0 kW
Max. apparent AC power3.0 kVA to 10.0 kVA
Max. output current (at grid voltage)13.0 A to 43.5 A
AC nominal voltage230 V
Number of DC connections2
Operating Temperature Range-25°C to +60°C