EasyManua.ls Logo

Furuno TECDIS - Page 74

Furuno TECDIS
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TECDIS Installation Manual Page 73
Checklists prior to completion of TECDIS TCS and TECDIS AW installation completed
Vessel Name / ID:
Date of installation:
Name of technician:
Checklist performed
(Sign):
The checklists in section 6.2 shall be filled in and signed for all TECDIS installations where
Track Control functionality is present (TECDIS TCS / TECDIS AW), in order to verify
proper installation of the ECDIS system onboard.
6.3 Additional checklist prior to completion of TECDIS AW installation
No. Item Content Result Remarks
1
Conning Verify that when one of the ECDIS processors
lose sensor data on one serial line, display of
sensor data (relevant according to failed serial
line) on conning monitor is not affected.
2 General Verify that installation is done according to block
diagram for TECDIS AW system.
3 General Verify that installation is done according to
functional description given for TECDIS AW
system.
4 General Verify that required conning info according to
NAUT AW requirements is displayed correctly.
5 Gyro Verify that requirements set forth in section 1.7
are fulfilled.
Additional checklist prior to completion of TECDIS AW installation completed
Vessel Name / ID:
Date of installation:
Name of technician:
Checklist performed
(Sign):
The checklist in section 6.3 shall be filled in and signed for all TECDIS AW installations, in
order to verify proper installation of the ECDIS system onboard.

Table of Contents

Related product manuals