EasyManua.ls Logo

GE AKTA avant - Site Preparation; Section See Page

GE AKTA avant
202 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.1 Site preparation
Introduction
This section describes the site planning and the preparations necessary to perform before
installation of an ÄKTA avant system. The purpose is to provide planners and technical
staff with the data needed to prepare the laboratory for the installation.
The laboratory site must be planned and prepared before installing the ÄKTA avant
system. The performance specifications of the system can be met only if the laboratory
environment fulfills the requirements stated in this chapter.
In this section
See pageSection
534.1.1 Delivery and storage
554.1.2 Room requirements
584.1.3 Site environment
604.1.4 Power requirements
614.1.5 Computer requirements
634.1.6 Required materials
52 ÄKTA avant Operating Instructions 29101556 AB
4 Installation
4.1 Site preparation

Table of Contents

Other manuals for GE AKTA avant

Related product manuals