4.5 Prime inlets and purge pump heads
About this section
Before using the sample pump or system pumps it is important to do the following:
•
Prime the inlets (fill the inlets with liquid).
•
Purge the pumps (remove air from the pump heads).
This section describes how to prime the buffer inlets, sample inlets, and Q inlets, and
how to purge the system pumps and the sample pump.
In this section
This section contains the following subsections:
See pageSection
864.5.1 Prime buffer inlets and purge system pumps
934.5.2 Prime sample inlets and purge Sample Pump
984.5.3 Prime Q inlets
ÄKTA avant Operating Instructions 29101556 AB 85
4 Installation
4.5 Prime inlets and purge pump heads