4.1.6 Required materials
Introduction
This section describes the accessories required for the installation and operation of the
ÄKTA avant instrument.
Buffers and solutions
The buffers and solutions listed in the following table are required during the installation
procedure and should be provided at the installation site.
Scope of useRequired volumeBuffer/solution
Air sensor test, fraction collector
test, Quaternary Valve test and
system test
1 literDistilled water
Quaternary Valve test0.5 liter1% acetone in distilled
water
System test0.5 liter1% acetone and 1 M NaCl
in distilled water
Priming of the pump piston rinsing
system
200 ml20% ethanol
Laboratory equipment
The equipment listed in the following table is required during the installation procedure
and should be provided at the installation site.
SpecificationEquipment
For buffers and wasteFlasks, liquid containers
For protectionGloves
For protectionProtective glasses
ÄKTA avant Operating Instructions 29101556 AB 63
4 Installation
4.1 Site preparation
4.1.6 Required materials

Table of Contents

Other manuals for GE AKTA avant

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AKTA avant and is the answer not in the manual?

GE AKTA avant Specifications

General IconGeneral
BrandGE
ModelAKTA avant
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals