EasyManua.ls Logo

GE AKTA avant - UV Monitor

GE AKTA avant
202 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
In the Process Picture:5
Click the Sample inlet icon, then click Buffer.
Click the Sample pump icon: Set the Sample flow to 1.0 ml/min for ÄKTA
avant 25 or 5.0 ml/min for ÄKTA avant 150.
Click Set flow rate.
Result: The sample pump flow starts.
Connect a 25 to 30 ml syringe to the left purge valve of the sample pump.
Make sure that the syringe fits tightly into the purge connector.
6
Open the purge valve by turning it counter-clockwise about three-quarters
of a turn. Draw 5 to 10 ml of liquid slowly into the syringe with a rate of about
1 ml/s.
7
Close the purge valve by turning it clockwise. Disconnect the syringe and
discard its contents.
8
96 ÄKTA avant Operating Instructions 29101556 AB
4 Installation
4.5 Prime inlets and purge pump heads
4.5.2 Prime sample inlets and purge Sample Pump

Table of Contents

Other manuals for GE AKTA avant

Related product manuals