GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
8-44 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-10-3 Removal procedure (cont’d)
3.) Unscrew 6 screws from the back side of the A/N key assy.
4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-10-4 Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-76 Screws on the A/N Key
Table 8-11 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-10. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-7-4
A/N Key assy validation