EasyManua.ls Logo

GE LOGIQ P5 Basic OB - Power Off; Shutdown

GE LOGIQ P5 Basic OB
532 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
3-14 Section 3-5 - Completing the Installation
3-5-2 Power Off/ Shutdown
NOTE: After turning off a system, wait at least ten seconds before turning it on again. The system may
not be able to boot if power is recycled too quickly.
3-5-2-1 Power Shutdown
1.) Press the ON/OFF key at the front of the System. refer to Figure 3-9 on page 3-12 .
2.) Click the shutdown icon in the shutdown dialog box and wait until the system shutdown.
3.) Switch OFF the Main Circuit Breaker at the rear of the system refer to Figure 3-8 on page 3-11 .
4.) Disconnect the Main Power Cable is necessary.
For example : Relocating the scanner.

Table of Contents

Related product manuals