EasyManuals Logo
Home>GE>Medical Equipment>LOGIQ S8 R3

GE LOGIQ S8 R3 User Manual

GE LOGIQ S8 R3
418 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #397 background imageLoading...
Page #397 background image
GE HEALTHCARE
DIRECTION 5394227, 12 LOGIQ S8/LOGIQ E8 SERVICE MANUAL
Section 9-8 - Electrical Safety Tests 9 - 23
9-8-6 Data sheet for enclosure/chassis leakage current
Table 9-15 below shows a typical format for recording the enclosure/chassis leakage current.
Measurements should be recorded from multiple locations for each set of test conditions.
The actual location of the test probe may vary by Ultrasound system.
NOTE: Record all data in the Electrical safety tests log.
NOTE: Values in italics font are given as examples only.
Table 9-15 Typical data format for recording enclosure/chassis leakage
Unit under test___________________________ Date of test:_____________________
Test Conditions Measurement/Test Point Location
System
Power Grounding/PE
Rear
Panel
Lower
Frame
Probe
Connector
Main
Handle
Off Closed
Off Open
On Closed
On Open

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ S8 R3 and is the answer not in the manual?

GE LOGIQ S8 R3 Specifications

General IconGeneral
BrandGE
ModelLOGIQ S8 R3
CategoryMedical Equipment
LanguageEnglish

Related product manuals