EasyManua.ls Logo

GE Optima IGS 330 - Page 200

GE Optima IGS 330
202 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rectifier neutral input to X1-N-rectifer terminal,
Rectifier ground to X1-PE-rectifier terminal.
g. Connect the Fluoro UPS output cable from PDB power block 2 as follows (Illustration
7-6):
Output load 1 to X1- L1 terminal,
Output load 2 to X1-L2 terminal,
Output load 3 to X1-L3 terminal,
Ground to X1-PE-Load terminal.
2. Tie the power cables to the UPS and place the protection plates back on the UPS.
1.4 Finalization
No finalization steps.
Optima IGS 320, Optima IGS 330 Pre-Installation Manual
Direction 5537562-1-1EN, Revision 3
200 1 PIST0021 - US Fluoro UPS and PDB connection

Table of Contents

Related product manuals