EasyManua.ls Logo

GE VersaMax PLC

GE VersaMax PLC
318 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.2.3 EZ Program Store
The EZ Program Store device (IC200ACC003) can be used to store and update the
configuration, application program, and reference table data of a VersaMax PLC. A
programmer and PLC CPU are used to initially write data to the device.
PLC
1.3 Power Supplies
An AC or DC Power Supply provides +5V and +3.3V power to the modules in the rack.
Additional power supplies can be installed on special booster carriers if needed for
systems where the number of modules creates the need for a booster. The AC or DC
Power Supply on the CPU or NIU and the Power Supply that resides on the Booster
Carrier must share the same external power source.
CPU models IC200CPU005 and IC200CPUE05 require the use of an expanded 3.3V
power supply. Refer to the following table.
IC200PWR001
VDC
+
INPUT
-
24 VDC
POWER SUPPLY
NOT
USED
20 GFK-1503E VersaMax PLC User Manual
For public disclosure

Table of Contents

Related product manuals