Part No. 40462 DPL-25S • DPL-30S • DPL-25S Super Series 7 - 23
September 2016 Section 7 - Repair Procedures
PLATFORM
How to Test Power-to-Platform
GFCI outlet
1 Fully lower the platform, turn the key switch off.
2 AC and DC models: Be sure the AC power
supply is properly connected.
3 Connect an AC voltage tester or a small hand
tool to the platform GFCI receptacle.
4 Test the voltage or test the hand tool operation.
Result: The voltage should be 115V AC nominal
or the hand tool should operate normally.
5 Push the black TEST button on the GFCI
receptacle.
Result: The voltage should be 0V or the hand
tool should not operate.
6 Push the red RESET button on the GFCI
receptacle.
Result: The voltage should be 115V AC nominal
or the hand tool should operate normally.

Table of Contents

Other manuals for Genie DPL Super Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Genie DPL Super Series and is the answer not in the manual?

Genie DPL Super Series Specifications

General IconGeneral
BrandGenie
ModelDPL Super Series
CategoryLifting Systems
LanguageEnglish

Related product manuals