EasyManuals Logo

Genie DPL Super Series Service Manual

Genie DPL Super Series
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #24 background imageLoading...
Page #24 background image
Part No. 40462 DPL-25S • DPL-30S • DPL-35S Super Series 4 - 7
September 2016 Section 4 - Scheduled Maintenance Procedures
Table B Procedures
B-1
Inspect the Electrical Wiring
Maintaining electrical wiring in good condition is
essential to safe operation and good machine
performance. Failure to find and replace burnt,
chafed, corroded or pinched wires could result in
unsafe operating conditions and may cause
component damage.
Electrocution/burn hazard. Contact
with hot or live circuits may cause
death or serious injury. Remove
all rings, watches and other
jewelry.
1 Inspect the following areas for burnt, chafed,
corroded and loose wires:
All base wiring
Inside of the ground control box
Inside of the base junction boxes
Hydraulic power unit
All external machine electrical cables
Inside of the platform control box
DC models: battery and charger
AC power supply cord
B-2
Inspect All Welds
Weld inspections are essential to safe machine
operation and good machine performance. Failure
to locate and repair damage may result in an
unsafe operating condition.
1 Visually inspect the welds in the following
locations:
Platform and platform components
Base
Mast brace mounting brackets
Ladder mounting bracket

Table of Contents

Other manuals for Genie DPL Super Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Genie DPL Super Series and is the answer not in the manual?

Genie DPL Super Series Specifications

General IconGeneral
BrandGenie
ModelDPL Super Series
CategoryLifting Systems
LanguageEnglish

Related product manuals