Installation 5
0020177748_03 ENERGY Installation and maintenance instructions 11
5.3 Heating water supply in the open heating
system
Connect the product to a supply/expansion tank as
shown in the figure.
The tank must not be more than 27 m (90 ft) above
the product.
The open vent pipe must be installed with an upward
gradient and must not be blocked.
Supply line diameter: 15 mm
The relative positions of the pump, supply and open
vent pipe must be as shown in the figure.
Conditions: Combined supply and open vent pipe
Install the line in accordance with "BS 5449".
Diameter: 22 mm
5.4 Connecting the heating flow and heating
return
2
1
1 Heating return connec-
tion
2 Heating flow connection
1. Establish the heating connections in accordance with
the applicable standards.
2. Check whether the connections ( Page 19) are leak-
tight.
5.5 Gas connection
1
1. Establish the gas connection (1) in accordance with the
applicable standards.
2. Purge the gas line before start-up.
3. Check the entire gas line properly for leak-tightness.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Glow-worm EASICOM 3 25r and is the answer not in the manual?

Glow-worm EASICOM 3 25r Specifications

General IconGeneral
BrandGlow-worm
ModelEASICOM 3 25r
CategoryBoiler
LanguageEnglish

Related product manuals