EasyManua.ls Logo

Gossen MetraWatt ECUTEST ST BASE - EL1 - Function Test for Extension Cords

Gossen MetraWatt ECUTEST ST BASE
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Gossen Metrawatt GmbH 39
SECUTEST ST BASE(10) / PRO and SECULIFE ST BASE(25)
13.15 EL1 – Function Test for Extension
Cords
Attention!
!
This function permits an evaluation of
the continuity of the active conduc-
tors L(1, 2, 3) and N of an extension
cord. The PE conductor isn’t tested
in this case!
See corresponding single measurements for
the testing of R
PE
and R
INS
.
Note
See section 14 with regard to testing
extension cords per DIN VDE 0701-
0702, for which R
PE
and R
INS
are
measured.
Connecting the EL1 Adapter
Connect the EL1 adapter to the P1 spe-
cial sockets at the test instrument.
Connect the plug at the end of the ex-
tension cord to the test socket.
Connect the coupling socket at the end
of the extension cord to the plug at the
EL1 adapter.
Connecting Test Adapters VL2E and AT3-IIIE
Connection examples can be found in section
13.19.
Continuity test for L and N
Meas. Parameter Test for
Measurement type
Continuity
L(1/2/3), N
Short-circuit
between
L(1/2/3), N
Reversed polarity /
clockwise
phase sequence
EL1 adapter
XX
EL1 adapter
(continuity only)
X—
VL2E adapter
XXX
AT3-IIIE adapter
XXX
Select measuring function
1
EL1
Select parameters
2
Set parameters
3
Connect the DUT
4
EL1 adapter
P1
VL2E adapter
Start test
5
Save measured values to clipboard
6
Stop test
7
Save measurements under ID no.
9

Table of Contents

Related product manuals