EasyManua.ls Logo

Gossen MetraWatt ECUTEST ST BASE - RINS - Insulation Resistance Measurement for Protection Category I Duts; RINS - Insulation Resistance Measurement; For Protection Category II Duts

Gossen MetraWatt ECUTEST ST BASE
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Gossen Metrawatt GmbH 29
SECUTEST ST BASE(10) / PRO and SECULIFE ST BASE(25)
13.5 RINS – Insulation Resistance
Measurement for Protection
Category II DUTs
U+ = increase UISO(set)
U– = decrease UISO(set)
Connect the DUT to the test socket.
Contact all conductive, exposed parts
with test probe P1.
Meas. Parameter Meaning
Measurement type
LN(TS) P1 Testing is conducted between
short-circuited LN mains termi-
nals at the test socket and test
probe P1.
(connection via test socket, via
VL2E, AT3-IIIE,
AT3-IIS, AT3-II S32
or AT16DI/AT32DI adapter
)
UISO(set) U+/U–
> 50 ... < 500 V Variable test voltage can be en-
tered with the numeric keypad
Select measuring function
1
RINS
Select parameters
2
Set parameters
3
Connect the DUT
4
LN(TS)-P1
P1
Start test
5
Save measured values to clipboard
6
Stop test
7
Save measurements under ID no.
8

Table of Contents

Related product manuals