EasyManuals Logo

Graco ProMix 2KS Repair Manual

Graco ProMix 2KS
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #40 background imageLoading...
Page #40 background image
Service
40 312780K
Service
Before Servicing
1. Flush system and follow Pressure Relief Proce-
dure, page 14, if service time may exceed pot life
time and before servicing fluid components.
2. Close main air shutoff valve on air supply line and
on ProMix 2KS.
3. Shut off ProMix 2KS power (0 position). F
IG. 14.
4. If servicing EasyKey, also shut off power at main cir-
cuit breaker.
After Servicing
After servicing the system, be sure to follow the
Start Up checklist and procedure in the ProMix 2KS
Operation manual.
To avoid electric shock, turn off EasyKey power
before servicing.
Servicing EasyKey display exposes you to high
voltage. Shut off power at main circuit breaker
before opening enclosure.
All electrical wiring must be done by a qualified
electrician and comply with all local codes and reg-
ulations.
Do not substitute or modify system components as
this may impair intrinsic safety.
Read Warnings, page 9.
NOTICE
To avoid damaging circuit board when servicing, wear
Part No. 112190 grounding strap on wrist and ground
appropriately.
FIG. 14: Power Off
0 = OFF
TI12657a

Table of Contents

Other manuals for Graco ProMix 2KS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Graco ProMix 2KS and is the answer not in the manual?

Graco ProMix 2KS Specifications

General IconGeneral
BrandGraco
ModelProMix 2KS
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals