In case of downtimes of 1 to 4 weeks before commissioning, as a minimum check the lubricating film on guideways and racks (II) and the hydraulic lines for air bubbles and kinks (VII). If necessary,
carry out a check of the complete lubrication system.
As operator, check the lubrication system during initial commissioning, after downtimes of more than 4 weeks, if there is no lubricating film and after the cartridge or pump of the lubrication sys-
tem has been replaced.
The operator is always responsible for adequate and properly functioning lubrication.