Installation
2.2.3 Mounting to dual instrument poles
Follow these guidelines and refer to Figure 2 and Figure 5 to mount the analyzer to
instrument poles:
• Mount the analyzer mounting bracket to two instrument poles that are attached to a
common surface. Do not secure to two instrument poles that could move
independently.
• The instrument poles should extend at least 10 inches (254 mm) from a common rigid
base and should be no larger than 2 inches (50.8 mm) in diameter.
• Use four 5/16-inch U-bolts, two for each 2-inch pipe, and eight matching nuts, to
mount the analyzer mounting bracket to two rigid instrument poles. Use U-bolts and
nuts that can withstand the process environment. HACH Company does not supply
U-bolts or nuts.
• The U-bolts and nuts should not extend more then 0.60 inches (15 mm) from the
inside of the mounting bracket to allow clearance for the analyzer.
Figure 5 PAT700 instrument-pole mount