7. INSTALLATION AND COMMISSIONING
Please follow instructions mentioned below for safe and trouble free installation of Inverter modules.
1 After receipt of the drive controller, inspection of the module is necessary as per the procedure
mentioned in “
Inspection of the Module” chapter.
2 Module is designed for vertical mounting inside a panel. Always fix the module with vertical
alignment.
3 Ensure that the Mounting hole dimensions on the Panel U-sheet is as per the dimensional details
given in this manual
WARNING
• Please follow the instructions in the manual before installation and
commissioning
• Ensure to disconnect all power lines to the drive before handling or
commissioning
• Input power cable must be connected tightly and the equipment must be
grounded securely using proper grounding techniques
• When the inverter is not running, the motor terminals U,V,W will have
dangerous voltages.
• UVW terminals are for motor connections. Do not connect Power supply to
these terminals.
• Operation of the module is by authorized, trained personnel experienced in
handling high voltage electrical equipments and fixtures.
CAUTION
• When handling the inverter, please lift as a whole unit. Otherwise may
cause the main unit to fall off resulting in personal injury or damage to the
unit.
• Install the inverter on a metal base.
• Air temperature around the inverter cabinet should be maintained below
50Deg C. For this purpose use fans for air circulation inside the panel.
• Refer to Technical Specifications for environment conditions in which this
product can be operated.
• Do not install the inverter in any place exposed to dust, direct sunlight,
corrosive gas, inflammable gas or oil