EasyManua.ls Logo

HIKVISION DS-K3BC430LX-868 - Page 17

HIKVISION DS-K3BC430LX-868
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
To prevent stainless steel from rusng due to dirt during
construcon, it is recommended that the protecve lm be
removed aer the installaon is completed. There may be
residual adhesive at the lm cung posion. It is
recommended to use WD-40 protecve liquid to wipe aer
tearing the lm.
It is recommended that at least two people collaborate to
install the sleeve. You'd
beer wear gloves throughout the
enre process, handle with care, and pay aenon to
prevenng crushing or pinching injuries.
1. Prepare for the installaon tools, check the components, and
prepare for the
installaon base.
2. Seal the boom of the pedestal with sealing materials to
prevent water accumulaon.
3. Remove the protecve panel on the top of the device, and
determine the barrier direcon and the pedestal installaon
posion according to the default barrier opening direcon
mark.
Figure 3-1 Default Barrier Opening Direcon Mark
Note
Do not immerse the pedestal in the water. In special
circumstances, the immersed height should be no more than
150 mm. The boom circuit board can't be immersed.
4. Use a cross screwdriver to remove screws of the decorave
ring and cable protecon panel, and complete wiring.
4

Table of Contents

Related product manuals