EasyManua.ls Logo

Hitachi G200 - Identifying Hardware Faults

Hitachi G200
55 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting the SVP
The SVP comes with two r
ack rail assemblies. Each assembly consists of an
inner fixed chassis rail that secures directly to the SVP chassis, and an outer
fixed rack rail that secures directly to the rack itself.
Use the following procedures to mount the SVP in a rack.
Choose a mounting location
Procedure
1. Install the SVP in the top bay of the rack.
2. Leave enough distance in front of the rack to enable you to open the
front bezel (approximately 25 inches).
3. Leave approximately 30 inches of clearance in the back of the rack to
allow for sufficient airflow and ease in servicing.
Installing the inner rail extension
The SVP includes chassis ears that you must remove before installing the
rails.
Installing the SVP 25
Hitachi Virtual Storage Platform G200, G400, G600 Service Processor Technical Reference

Other manuals for Hitachi G200

Related product manuals