EasyManua.ls Logo

Hitachi G200 - Connecting to the SVP

Hitachi G200
55 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedure
1. Align chassis r
ails with the front of the rack rails.
2. Slide the chassis rails into the rack rails, keeping the pressure even on
both sides.
If necessary, press the locking tabs when inserting.
When the server is pushed completely into the rack, the locking tabs
"click" into the locked position.
3. Optional: Insert and tighten the thumbscrews that hold the front of the
server to the rack.
Connecting to the SVP
The rear panel of the SVP has four RJ-45 ports. Using Category 5 or better
Ethernet cables, perform the following connections on the SVP
. Your
management console must be able to access the SVP.
28 Installing the SVP
Hitachi Virtual Storage Platform G200, G400, G600 Service Processor Technical Reference

Other manuals for Hitachi G200

Related product manuals