Procedure
1. Connect LAN1 to a switch on y
our IP network.
Note: If y
our network uses IP addresses 192.168.0.15-17, do not
connect the LAN1 port to your switch until after you complete the
Initial Startup.
2. Connect LAN2 to a management console PC.
T
ypically, this is a notebook PC.
3. Connect LAN3 to the user LAN port on storage system controller 1.
4. Connect LAN4 to the user LAN port on storage system controller 2.
Powering up the SVP
Prerequisites
P
ower up the SVP before you power up the storage system.
Installing the SVP 29
Hitachi Virtual Storage Platform G200, G400, G600 Service Processor Technical Reference