EasyManua.ls Logo

Honeywell 900U02-0100 - Page 108

Honeywell 900U02-0100
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
94 ControlEdge HC900 Process & Safety Controller User and Installation Manual Revision 10
May 2019
Step
Procedure
Comments
Reference
9
Install I/O modules in
racks. Be sure to follow
placement guidelines
under Heat Rise De-rating
page 55.
10
Install I/O module, install
appropriate terminal block.
11
In each slot location not
occupied by an I/O
module, install a Filler
Block cover, Part number
900TNF-0001.
Note: The Filler Block Cover looks much like an I/O Terminal
Block assembly, except that it does not include the wire
terminating block (screw terminals). The Filler Block mounts in
the same manner as a Terminal Block (with captured screws at
top and bottom). Blank labels are provided for mounting in the
hinged door.

Table of Contents

Related product manuals