EasyManua.ls Logo

Honeywell 900U02-0100 - Table 9 - Assemble C30;C50;C70 Controller Rack

Honeywell 900U02-0100
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
76 ControlEdge HC900 Process & Safety Controller User and Installation Manual Revision 10
May 2019
Table 10.
Table 9 Assemble C30/C50/C70 Controller Rack
Step
Procedure
Comments/References
1
Carefully place the Power
Supply in the leftmost slot in
the Rack, ensuring that the
connector at the back seats
properly.
Insert a slot screwdriver in
the slots at the top and
bottom of the power supply
cover while pulling backward
to open the cover.
Fasten the screws (captured
in the face of the power
supply) into the tabs at top
and bottom of the rack.
Torque to 0,4-0,5 N.m (3.5
4.4 Lb-In).
2
Hazardous Voltage
Ensure that wiring to the Power Supply is disconnected from the site AC source before
installing wiring.
Do not remove Yellow/Green wire from grounding stud on the power supply.
Failure to comply with these instructions could result in death or serious injury.

Table of Contents

Related product manuals