EasyManua.ls Logo

Honeywell 900U02-0100 - Assemble I;O Expansion Racks; Table 11 - Assemble I;O Expansion Racks

Honeywell 900U02-0100
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80 ControlEdge HC900 Process & Safety Controller User and Installation Manual Revision 10
May 2019
5.4. Assemble I/O Expansion Racks
I/O Expansion Rack assembly information is given in Table 11.
Table 11 Assemble I/O Expansion Racks
Step
Procedure
Comments/References
1
Insert power supply into left-most slot
in the I/O rack. See Table 9 steps 1
and 2 for wiring details.
If using redundant power, your I/O rack will contain a second
smaller compartment, see 1 in the following figure. Insert first
power supply in the larger compartment as shown, to the
immediate right of the plate dividing the two compartments.
2
Redundant Power (optional):
Insert the second power supply in the
left side of the smaller compartment,
see 1 in figure above. See Table 9
steps 1 and 2 for details.
Insert the PSM between the 2 power
supplies. Fasten it in place with
screws at top and bottom.
See 1 in figure above. See Table 9 steps 1 and 2 for wiring
details.

Table of Contents

Related product manuals