EasyManua.ls Logo

Honeywell 900U02-0100 - Page 278

Honeywell 900U02-0100
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
264 ControlEdge HC900 Process & Safety Controller User and Installation Manual Revision 10
May 2019
Latch/Unlatch RTP to rail
Step
Action
1
Mounting screws must be installed at each end of the mounting rail; with additional screws approx. every
8"(203mm) to prevent twisting of the rail.
2
Insert one side of DIN rail at A.
3
Insert other side of DIN rail at B, and push B over the rail to snap into place.
4
To remove, using slot screwdriver to lift C up gently (plastic is fragile) to disengage at B. Lift up and over rail,
then disengage at A.
DIN rail
A
B
C

Table of Contents

Related product manuals