EasyManuals Logo

HP A-MSR20 Installation Guide

HP A-MSR20
55 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
5
Table 4 Harmful gas concentration limits in the equipment room
Gas
Maximum concentration (mg/m
3
)
SO
2
0.2
H
2
S
0.06
NH
3
0.05
Cl
2
0.01
Cooling
Air flows through the A-MSR20 from left to right, as shown in Figure 7.
Figure 7 A-MSR20 ventilation
To prevent overheating:
Provide adequate clearance for air flow.
Provide at least 10 cm [3.94 in] ventilation space around the router's air intake and outlet vents.
For heat dissipation and device maintenance, the front and rear of the rack should be at least
0.8 m (2.62 ft) away from walls or other devices.
The equipment room ceiling height should be no less than 3 m (9.84 ft).
Make sure the site has an adequate cooling system.
Lightning protection
To protect the router from lightning:
Make sure the grounding cable of the chassis is grounded properly.
Make sure the grounding terminal of the AC power receptacle is grounded properly.
Install a lightning arrester at the input end of the power supply.
Install a lightning arrester at the input end of outdoor signal lines (for example, E1/T1 line) to which
the router’s interface modules are connected.

Table of Contents

Other manuals for HP A-MSR20

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP A-MSR20 and is the answer not in the manual?

HP A-MSR20 Specifications

General IconGeneral
BrandHP
ModelA-MSR20
CategoryNetwork Router
LanguageEnglish

Related product manuals