EasyManua.ls Logo

HP HPE ProLiant DX360 Gen10 - Installing the Serial Cable Option

HP HPE ProLiant DX360 Gen10
187 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8. Install the access panel (Install the access panel).
9. Install the server in the rack.
10.
Connect each power cord to the server.
11.
Connect each power cord to the power source.
12.
Power up the server (
Power up the server).
Installing the serial cable option
Prerequisites
Before installing this option, be sure you have the following:
The components included with the hardware option kit
5 mm socket
Procedure
1.
Observe the following alerts:
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
components to cool before touching them.
CAUTION: To prevent damage to electrical components, properly ground the server before beginning any
installation procedure. Improper grounding can cause electrostatic discharge.
2. Back up all server data.
3. Power down the server (Power down the server).
4. Remove all power:
Hardware options installation
130

Table of Contents

Related product manuals