42
Index
Numerics
1/10G BASE-T autosensing Ethernet
port LED, 34
1/10GBASE-T autosensing Ethernet
port, 30
19-inch rack
switch installation, 4
A
AC power cord
connecting, 10
AC power module
grounding switch through AC power cord, 9
access
first time switch access, 13
accessories needed for installation, 3
Appendix
A, chassis views and technical specifications,
28, 28
B
bits per second (parameter), 16
C
cable
connecting console, 13
connecting USB mini console, 14
fiber cable laser safety recommendations, 3
grounding the switch with a grounding
conductor buried in the earth ground, 9
grounding the switch with grounding strip, 8
planning IRF cabling scheme, 23
chassis
views, 28
cleanliness
installation site, 2
configuring
IRF basic settings, 24
switch, 13, 17
troubleshooting configuration terminal
problems, 26
verify the IRF fabric setup, 25
connecting
AC power cord, 10
console cable, 13
DC power cord, 11
first time switch access, 13
IRF member switches in a ToR solution, 24
IRF member switches in one rack, 23
IRF physical ports, 24
planning IRF connections, 22
power cord, 10
USB mini console cable, 14
console
connecting cable, 13
connecting USB mini cable, 14
port technical specifications, 30
D
data bits (parameter), 16
DC power cord
connecting, 11
device
troubleshooting fan failure, 26
troubleshooting fixed power module failure, 25
troubleshooting power module, 25
displaying
troubleshooting garbled display, 27
troubleshooting no display, 26
dust
installation site, 2
E
electrical
connecting AC power cord, 10
connecting console cable, 13
connecting DC power cord, 11
connecting power cord, 10
connecting USB mini console cable, 14
EMI prevention, 2
grounding switch through AC power cord, 9
grounding switch with a grounding conductor
buried in the earth ground, 9
grounding switch with grounding strip, 8
grounding the switch, 7
powering on switch, 16
troubleshooting fixed power module failure, 25
troubleshooting power module failure, 25
electromagnetic interference. See EMI prevention
EMI prevention, 2
emulation (parameter), 16
environment
examining installation site, 1
site cleanliness, 2
site dust concentration, 2
site gas saturation, 2