EasyManua.ls Logo

HPE OfficeConnect 1950 12XGT 4SFP+ - Page 47

HPE OfficeConnect 1950 12XGT 4SFP+
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
43
site humidity, 2
site temperature, 2
examining installation site, 1
F
fan
failure (troubleshooting), 26
fiber
laser safety recommendations, 3
fixed power module
failure (troubleshooting), 25
flow control (parameter), 16
flowchart of IRF fabric setup, 20
G
garbled display (troubleshooting), 27
gas (installation site), 2
grounding
EMI prevention, 2
grounding conductor buried in the earth
ground, 9
grounding strip, 8
switch, 7
switch through AC power cord, 9
switch with a grounding conductor buried in
the earth ground, 9
switch with grounding strip, 8
H
hardware
1/10G BASE-T autosensing Ethernet port
LED, 34
1/10GBASE-T autosensing Ethernet port
technical specifications, 30
connecting AC power cord, 10
connecting DC power cord, 11
console port technical specifications, 30
grounding switch, 7
grounding switch through AC power cord, 9
grounding switch with a grounding conductor
buried in the earth ground, 9
grounding switch with grounding strip, 8
management Ethernet port LED, 34
management Ethernet port technical
specifications, 30
port technical specifications, 30
RPS status LED, 34
SFP+ port LED, 35
SFP+ port technical specifications, 31
switch installation, 1, 4
switch installation in 19-inch rack, 4
system status LED, 33
verifying switch installation, 12
workbench switch mounting, 7
humidity (installation site), 2
I
ID (IRF member), 21
identifying
IRF master switch, 21
IRF member switch physical ports, 23
installing
accessories, 3
EMI prevention, 2
examining installation site, 1
IRF fabric installation site planning, 21
site cleanliness, 2
site humidity, 2
site temperature, 2
switch, 1, 4
switch in 19-inch rack, 4
tools, 3
IRF fabric
configuring basic settings, 24
connecting member switches in a ToR solution,
24
connecting member switches in one rack, 23
connecting physical ports, 24
identifying master switch, 21
identifying member switch physical ports, 23
planning, 21
planning cabling scheme, 23, 23
planning connections, 22
planning installation site, 21
planning member IDs, 21
planning size, 21
planning topology, 22
setting up, 20
setup flowchart, 20
verify the IRF fabric setup, 25
L
LED
1/10G BASE-T autosensing Ethernet port, 34
management Ethernet port, 34
RPS status, 34
SFP+ port, 35
system status, 33
technical specifications, 33
login
first time, 18
quick set-up CLI, 13
Web interface, 17

Table of Contents

Related product manuals