EasyManua.ls Logo

HPE ProLiant DL20 Gen10 Plus - Installing an Energy Pack

HPE ProLiant DL20 Gen10 Plus
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing an energy packInstalling an energy pack
PrerequisitesPrerequisites
Before proceeding the installation, observe following guide line:
Make sure that a compatible type-p storage controller is installed .
Make sure that you have the storage controller backup power cable that ships with the storage controller.
ProcedureProcedure
1. If physically powering down a server with the front bezel installed, remove the front bezel .
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the rack .
6. Place the server on a flat, level work surface.
7. Remove the access panel .
8. Install the energy pack:
a. Insert the energy pack in the holder (callout 1).
Make sure that the energy pack is locked in the holder.
b. Route the energy pack cable across the midwall cable channel (callout 2).
c. Connect the energy pack cable (callout 3).
9. Connect the storage controller backup power cable .
10. Install the access panel .
11. Install the server into the rack .
12. Connect all peripheral cables to the server.
13. Connect the power cords:
Installing an energy pack 125

Table of Contents

Related product manuals