EasyManua.ls Logo

HPE ProLiant DL20 Gen10 Plus - Installing an Optical Drive in the LFF Drive Chassis

HPE ProLiant DL20 Gen10 Plus
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing an optical drive in the LFF drive chassisInstalling an optical drive in the LFF drive chassis
CAUTION:CAUTION:
A discharge of static electricity from a finger or other conductor might damage system boards or other static-sensitive
devices. To prevent damage, observe antistatic precautions.
PrerequisitesPrerequisites
In the LFF drive chassis, the optical drive installation requires the P06681-B21 optical drive cable option.
Before you perform this procedure, make sure that you have the following items available:
T-10 Torx screwdriver
Phillips No. 1 screwdriver
ProcedureProcedure
1. If installed, remove the front bezel .
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the rack .
6. Place the server on a flat, level work surface.
7. Remove the access panel .
8. Remove the optical drive blank.
Retain the blank for future use.
9. Install the optical drive bracket.
Installing an optical drive in the LFF drive chassis 98

Table of Contents

Related product manuals