EasyManua.ls Logo

HPE ProLiant DL20 Gen10 Plus - Installing an Internal USB Device

HPE ProLiant DL20 Gen10 Plus
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing an internal USB deviceInstalling an internal USB device
ProcedureProcedure
1. If physically powering down a server with the front bezel installed, remove the front bezel .
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the rack .
6. Place the server on a flat, level work surface.
7. Remove the access panel .
8. Locate the internal USB port.
9. Remove the riser cage.
10. Plug in the USB device into the USB port.
11. Install the riser cage.
12. Install the access panel .
13. Install the server into the rack .
14. Connect all peripheral cables to the server.
15. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
16. Power up the server .
17. If removed, install the front bezel .
This installation is complete.
Installing an internal USB device 153

Table of Contents

Related product manuals