Installing the two-bay SFF drive cage optionInstalling the two-bay SFF drive cage option
For additional storage capacity, install the 2 SFF hot-plug drive cage option in the media bay of the SFF chassis. This drive cage option
supports SAS, SATA, or U.3 NVMe drives.
CAUTION:CAUTION:
A discharge of static electricity from a finger or other conductor might damage system boards or other static-sensitive
devices. To prevent damage, observe antistatic precautions.
PrerequisitesPrerequisites
A Flexible Slot power supply is required in 4 + 2 SFF hot-plug drive configurations .
Before you perform this procedure, make sure that you have a T-10 Torx screwdriver available.
ProcedureProcedure
1. If installed, remove the front bezel .
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the rack .
6. Place the server on a flat, level work surface.
7. Remove the access panel .
8. Remove the media bay blank:
a. Remove the media bay blank screws (callout 1).
Retain all screws for future use.
b. Disengage the media bay blank (callout 2).
c. Remove the media bay blank (callout 3).
Retain the blank for future use.
9. Install the 2 SFF hot-plug drive cage:
Installing the two-bay SFF drive cage option 95