EasyManua.ls Logo

HPE ProLiant DL20 Gen10 Plus - Page 141

HPE ProLiant DL20 Gen10 Plus
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15. Install the riser cage.
16. Connect the M.2 SSD SATA cables .
17. Install the access panel .
18. Install the server into the rack .
19. Connect all peripheral cables to the server.
20. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
21. Power up the server .
22. If removed, install the front bezel .
23. To configure the M.2 SSDs, see the OS-specific Intel VROC guide.
This installation is complete.
Installing the M.2 SATA SSD enablement option 141

Table of Contents

Related product manuals