EasyManua.ls Logo

HPE ProLiant DL20 Gen10 Plus - Page 143

HPE ProLiant DL20 Gen10 Plus
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Insert the SSD into the M.2 slot at a 45° angle (callout 1).
3. Carefully press the SSD down to the horizontal position (callout 2).
4. Install the SSD mounting screw (callout 3).
5. If you are installing a second SSD, repeat steps 2–4 on the slot 2.
Installing the M.2 pass-through cardInstalling the M.2 pass-through card
6. If physically powering down a server with the front bezel installed, remove the front bezel .
7. Power down the server.
8. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
9. Disconnect all peripheral cables from the server.
10. Remove the server from the rack .
11. Place the server on a flat, level work surface.
12. Remove the access panel .
Installing the M.2 SSD pass-through card option 143

Table of Contents

Related product manuals