EasyManua.ls Logo

HPE ProLiant DL20 - Replacing the Two-Bay LFF and Four-Bay SFF Hot-Plug Drive Backplanes

HPE ProLiant DL20
109 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
To replace the component, reverse the removal procedure.
Replacing the two-bay LFF and four-bay SFF hot-plug drive
backplanes
About this task
Procedure
1. Back up all data.
2. If installed, remove the security bezel.
3. Power down the server.
4. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5. Remove all drives.
6. Do one of the following:
Extend the server from the rack
Remove the server from the rack
7. Remove the access panel.
8. Disconnect all cables from the drive backplane.
Two-bay LFF hot-plug configuration
Four-bay SFF hot-plug configuration
Replacing the two-bay LFF and four-bay SFF hot-plug drive backplanes 35

Table of Contents

Related product manuals