14. Connect following cables to the system board:
Optical drive cable
Front USB and DisplayPort cable
15. Install the middle cover .
16. Install the access panel .
17. Install the server into the rack.
18. Connect all peripheral cables to the server.
19. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
20. Power up the server.
21. Install the front bezel .
ResultsResults
The installation is complete.
Installing the front USB and DisplayPort optionInstalling the front USB and DisplayPort option
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have a T-10 Torx screwdriver available.
About this taskAbout this task
In the SFF drive chassis, the front USB and DisplayPort option is included in the optical drive cage assembly kit. For more information, see
optical drive cage assembly installation in the SFF drive chassis .