EasyManua.ls Logo

HPE ProLiant DL325 Gen11 - Page 137

HPE ProLiant DL325 Gen11
243 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have the following items available:
Storage controller backup power cable (ships with the storage controller)
Energy pack extension power cable (P56659-B21)
ProcedureProcedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Remove the server from the rack.
5. Place the server on a flat, level work surface.
6. Remove the access panel .
7. Remove the middle cover .
8. Secure the energy pack in the retention latch located on the rear side of the drive cage.
9. Connect the energy pack extension power cable to the system board and energy pack cable .
10. Connect the storage backup power cable .
11. Install the access panel .
12. Install the server into the rack.
13. Connect all peripheral cables to the server.
14. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
15. Power up the server.
ResultsResults
The installation is complete.
HPE ProLiant DL325 Gen11 Server User Guide 137

Table of Contents

Other manuals for HPE ProLiant DL325 Gen11

Related product manuals