EasyManua.ls Logo

HPE ProLiant DL325 Gen11 - Page 136

HPE ProLiant DL325 Gen11
243 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Disconnect all peripheral cables from the server.
4. Remove the server from the rack.
5. Place the server on a flat, level work surface.
6. Remove the access panel .
7. Install the energy pack in the holder located on the left side of the chassis.
a. Insert the energy pack at an angle.
b. Push the energy pack down from other end.
Make sure that the energy pack is locked in the holder.
c. Connect the energy pack cable.
8. Connect the storage backup power cable .
9. Install the access panel .
10. Install the server into the rack.
11. Connect all peripheral cables to the server.
12. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
13. Power up the server.
ResultsResults
The installation is complete.
Installing an energy pack in configurations with the M.2 SSD pass-through cardInstalling an energy pack in configurations with the M.2 SSD pass-through card
HPE ProLiant DL325 Gen11 Server User Guide 136

Table of Contents

Other manuals for HPE ProLiant DL325 Gen11

Related product manuals