EasyManua.ls Logo

HPE ProLiant DL325 Gen11 - Page 154

HPE ProLiant DL325 Gen11
243 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
23. Power up the server.
ResultsResults
The installation is complete.
Installing an accelerator in the primary riser cageInstalling an accelerator in the primary riser cage
PrerequisitesPrerequisites
When installing a full-length accelerator, the card retainer option is required .
Before you perform this procedure, make sure that you have the following items available:
T-10 Torx screwdriver
T-15 Torx screwdriver
About this taskAbout this task
CAUTION:CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all PCIe slots have either a
riser slot blank or an expansion card installed.
CAUTION:CAUTION: A discharge of static electricity from a finger or other conductor might damage system boards or other static-
sensitive devices. To prevent damage, observe antistatic precautions.
ProcedureProcedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Remove the server from the rack.
5. Place the server on a flat, level work surface.
6. Remove the access panel .
7. Install the accelerator holder .
8. Remove the riser slot blank.
HPE ProLiant DL325 Gen11 Server User Guide 154

Table of Contents

Other manuals for HPE ProLiant DL325 Gen11

Related product manuals